Assistant Commandant for Engineering and Logistics

Office of Environmental Management


 

Environmental Planning and Historic Planning

The National Environmental Policy Act (NEPA) requires all Federal agencies to consider the impacts of proposed actions on the human environment and involve the public in the NEPA process. The Environmental Planning and Historic Preservation (EPHP) Team publishes all Environmental Impact Statements and Environmental Assessments of regional or national significance for public notice and comment. Interested parties can view recent draft and final NEPA documents below. Contact information for each project are included in each posting.

On April 23, 2019 CG-47 released the U.S. Coast Guard Environmental Planning Policy, COMDTINST 5090.1 (series) (EP CI) and the Environmental Planning Implementing Procedures (EP IP).  The EP CI mandates the use of the EP IP.  The two documents now align with the DHS NEPA policy, Implementation of the National Environmental Policy Act, Department of Homeland Security Instruction Manual 023-01-001-01 (series) and replace the old Coast Guard National Environmental Policy Act (NEPA) Implementing Procedures and Policy for Considering Environmental Impacts, COMDTINST 16475.1D, which has been cancelled. The EP CI and IP include significant changes to the Coast Guard environmental planning process and provide improved policy and procedures for complying with both NEPA and Environmental Effects Abroad of Major Federal Actions, Executive Order (EO) 12114.  Coast Guard members engaged in environmental planning efforts or taking actions that trigger NEPA or EO 12114 requirements must read both the EP CI and IP in order to implement their requirements effectively.  Significant changes from COMDTINST M16475.1D included in the EP CI and IP include but are not limited to:

  • Policy and procedures on the requirements of EO 12114.
  • Pre-planning process and notification requirements for NEPA and EO 12114.
  • Timing of compliance with other related environmental mandates (ESA, NHPA, etc.).
  • Requirements to track and report mitigation and monitoring commitments.
  • Requirement to establish formal agreements for providing environmental planning support.
  • Specific guidance for both the acquisitions and shore facilities management programs

Policy Documents

USCG Environmental Planning Policy, COMDTINST 5090.1

Environmental Planning Implementing Procedures for COMDTINST 5090.1 Environmental Planning Policy

United States Coast Guard (Coast Guard) Record of Decision for BNSF Railway Bridge 196.6 Project Across the Missouri River, Mile Point 1315.0, Morton and Burleigh Counties, Between Bismarck and Mandan, North Dakota

By USCG CG-BRG

PRINT  |  E-MAIL

The purpose of the project is to provide a safe and reliable crossing of the Missouri River. With in-service components that are over 130 years old and a history of exposure to ice jams, Bridge 196.6 is approaching the end of its useful life and needs to be replaced to safely move future rail traffic. The existing structure has shallow-foundation piers making the structure scour-critical. In addition, the existing main spans are configured with two pin-connected through trusses. Each truss contains fracture-critical members, which are subject to tensile loads. Failure of such a component would result in partial or total collapse. Lastly, due to the age and condition of the existing bridge, current rail usage is limited by speed, height, and weight.

Based on an independent review of all pertinent factors, including navigation and the human environment, the Coast Guard concludes that the proposed bridge across the Missouri River, as described above, would meet the reasonable needs of navigation and that all planning for and mitigation of significant impacts on the quality of the human environment have been included.