Key Bridge MTS 4
ASOFR LT Michael Gonzalez overlooking the aftermath of the bridge span 20-22, with debris built up after the top chord of the span was removed.

Photo by: Amanda Allen |  VIRIN: 240906-G-IF123-1004.JPG